
		{"id":1306,"date":"2026-09-09T16:06:21","date_gmt":"2026-09-09T08:06:21","guid":{"rendered":"https:\/\/www.paiyipower.com\/power-adapter-sample-evaluation\/"},"modified":"2026-09-09T16:23:39","modified_gmt":"2026-09-09T08:23:39","slug":"power-adapter-sample-evaluation","status":"publish","type":"post","link":"https:\/\/www.paiyipower.com\/pt\/power-adapter-sample-evaluation\/","title":{"rendered":"Avalia\u00e7\u00e3o de Amostras de Adaptadores de Energia: O Checklist Antes de Aprovar a Produ\u00e7\u00e3o"},"content":{"rendered":"<h1>Power Adapter Sample Evaluation: The Checklist to Run Before You Approve Production<\/h1>\n<p><strong>Published:<\/strong> September 2026<br \/><strong>Reading time:<\/strong> 8 min<br \/><strong>Audience:<\/strong> brand owners, hardware engineers and procurement teams evaluating first samples from a power adapter factory before approving mass production<\/p>\n<p><strong>By Han \u2014 Paiyi Power<\/strong>, an OEM\/ODM power adapter manufacturer that supplies model-specific test reports with every sample. <br \/><strong>Last updated: 9 September 2026.<\/strong><\/p>\n<hr>\n<div class=\"wp-block-rank-math-toc-block\" id=\"rank-math-toc\" style=\"background:#f5f7f8;border:1px solid #d9dee3;border-radius:6px;padding:16px 20px;margin:28px 0;\">\n<h2 style=\"font-size:18px;margin:0 0 10px;border:none;padding:0;\">Contents<\/h2>\n<nav>\n<ul style=\"margin:0;padding-left:20px;\">\n<li style=\"margin:4px 0;\"><a href=\"#direct-answer-how-do-you-evaluate-a-power-adapter-sample\">Direct answer: how do you evaluate a power adapter sample?<\/a><\/li>\n<li style=\"margin:4px 0;\"><a href=\"#evaluate-against-your-specification-not-against-a-feeling\">Evaluate against your specification, not against a feeling<\/a><\/li>\n<li style=\"margin:4px 0;\"><a href=\"#step-1-paperwork-before-electrons\">Step 1: paperwork before electrons<\/a><\/li>\n<li style=\"margin:4px 0;\"><a href=\"#step-2-electrical-bench-tests\">Step 2: electrical bench tests<\/a><\/li>\n<li style=\"margin:4px 0;\"><a href=\"#step-3-mechanical-and-label-checks\">Step 3: mechanical and label checks<\/a><\/li>\n<li style=\"margin:4px 0;\"><a href=\"#step-4-thermal-and-extended-run\">Step 4: thermal and the extended run<\/a><\/li>\n<li style=\"margin:4px 0;\"><a href=\"#the-golden-sample-seal-it-sign-it-keep-it\">The golden sample: seal it, sign it, keep it<\/a><\/li>\n<li style=\"margin:4px 0;\"><a href=\"#common-sample-stage-mistakes\">Common mistakes in power adapter sample evaluation<\/a><\/li>\n<li style=\"margin:4px 0;\"><a href=\"#frequently-asked-questions\">Frequently asked questions<\/a><\/li>\n<li style=\"margin:4px 0;\"><a href=\"#sources\">Sources<\/a><\/li>\n<\/ul>\n<\/nav>\n<\/div>\n<h2 style=\"border-bottom: 2px solid #1264a3; padding-bottom: 6px; margin-top: 36px;\" id=\"direct-answer-how-do-you-evaluate-a-power-adapter-sample\">Direct answer: how do you evaluate a power adapter sample?<\/h2>\n<p><strong>Run the sample against your own written specification in four passes \u2014 paperwork, electrical bench tests, mechanical checks, and a thermal extended run \u2014 and only approve production when every line has a pass, a measurement or a signed deviation.<\/strong> A sample that &#8220;works&#8221; proves almost nothing: any adapter can power a device for five minutes. The evaluation exists to catch the four things that surface later as field returns \u2014 loose tolerances, noisy output, weak connectors and missing documents \u2014 while they still cost nothing to fix. The whole checklist below runs in half a day on a bench with a load, a scope and a multimeter.<\/p>\n<hr>\n<h2 style=\"border-bottom: 2px solid #1264a3; padding-bottom: 6px; margin-top: 36px;\" id=\"evaluate-against-your-specification-not-against-a-feeling\">Evaluate against your specification, not against a feeling<\/h2>\n<p>The most common evaluation failure happens before the bench: the buyer never wrote a specification, so there is nothing to evaluate <em>against<\/em>. Write the spec first \u2014 output voltage and tolerance, current, connector, cable length, ripple limit, efficiency tier, ambient range, certifications \u2014 and send it with the RFQ. Then the sample evaluation is a line-by-line comparison, and every deviation becomes a documented decision instead of a vibe. Our <a href=\"https:\/\/www.paiyipower.com\/how-to-test-power-supply\/\">power supply test guide<\/a> covers the measurement methods referenced below.<\/p>\n<hr>\n<h2 style=\"border-bottom: 2px solid #1264a3; padding-bottom: 6px; margin-top: 36px;\" id=\"step-1-paperwork-before-electrons\">Step 1: paperwork before electrons<\/h2>\n<ul>\n<li><strong>Model-specific test report:<\/strong> the report names the exact model, carries a number, and lists the standards it was tested to \u2014 not a family &#8220;certificate&#8221;.<\/li>\n<li><strong>Certificate copies with verifiable numbers:<\/strong> CE, CB, FCC at minimum for your markets; check report numbers against the issuing lab.<\/li>\n<li><strong>Label proof:<\/strong> the artwork shows the rated output, plug type, warnings and the marks you asked for \u2014 as printed, not as discussed.<\/li>\n<li><strong>Specification conformance sheet:<\/strong> the factory&#8217;s own statement of what the sample was built to, so deviations are visible.<\/li>\n<\/ul>\n<p>Paperwork failures at sample stage are the cheapest failures you will ever catch. A factory that cannot produce a model-specific report for the sample will not produce one for production either \u2014 see <a href=\"https:\/\/www.paiyipower.com\/power-adapter-certification-by-country\/\">certification by country<\/a> for which documents exist per market.<\/p>\n<hr>\n<h2 style=\"border-bottom: 2px solid #1264a3; padding-bottom: 6px; margin-top: 36px;\" id=\"step-2-electrical-bench-tests\">Step 2: electrical bench tests<\/h2>\n<table style=\"border-collapse: collapse; width: 100%; margin: 18px 0; font-size: 15px;\">\n<thead>\n<tr>\n<th style=\"border: 1px solid #d9dee3; padding: 9px 11px; background: #f5f7f8; text-align: left;\">Test<\/th>\n<th style=\"border: 1px solid #d9dee3; padding: 9px 11px; background: #f5f7f8; text-align: left;\">Equipment<\/th>\n<th style=\"border: 1px solid #d9dee3; padding: 9px 11px; background: #f5f7f8; text-align: left;\">What &#8220;pass&#8221; looks like<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Output voltage &amp; tolerance<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Multimeter, load<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Within spec at 115 V and 230 V input, no-load and full load<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Ripple &amp; noise<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Oscilloscope, bandwidth-limited probe<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Within your mV limit <em>at full load, at the end of the cable<\/em><\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Current-limit behaviour<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Electronic load<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Defined type (fold-back \/ hiccup \/ latch), recovers as specified<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Efficiency &amp; no-load power<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Power analyser<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Meets your tier (DOE VI \/ CoC Tier 2) at 115 V <em>and<\/em> 230 V<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Inrush &amp; transient recovery<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Scope + load steps<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">No trip on your device&#8217;s start-up; rail recovers within spec after load steps<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Protections (OVP\/OCP\/SCP)<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Load, short tool<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Triggers and recovers safely per datasheet behaviour<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Measure ripple <strong>at your real load and at the end of your cable<\/strong>, not at no load with a short lead \u2014 the number that matters is the one your device sees, as explained in <a href=\"https:\/\/www.paiyipower.com\/how-to-test-power-supply\/\">how to test a power supply<\/a>.<\/p>\n<hr>\n<h2 style=\"border-bottom: 2px solid #1264a3; padding-bottom: 6px; margin-top: 36px;\" id=\"step-3-mechanical-and-label-checks\">Step 3: mechanical and label checks<\/h2>\n<ul>\n<li><strong>Fit check in your device or fixture:<\/strong> connector depth, clearance, bend radius at the strain relief.<\/li>\n<li><strong>Cable:<\/strong> gauge and length per spec; jacket marking legible; pull test at the defined force.<\/li>\n<li><strong>Label:<\/strong> durable (tape test), correct ratings, correct plug type for the destination market.<\/li>\n<li><strong>Weight and dimensions:<\/strong> matches the approved drawing \u2014 silhouette changes here become packaging problems later.<\/li>\n<\/ul>\n<hr>\n<h2 style=\"border-bottom: 2px solid #1264a3; padding-bottom: 6px; margin-top: 36px;\" id=\"step-4-thermal-and-extended-run\">Step 4: thermal and the extended run<\/h2>\n<p>Run the sample at full load for a minimum of two to four hours in the worst realistic placement (flat on a desk, enclosed if that is how your product lives) and log case temperature with a thermocouple. Compare against the <strong>derating curve<\/strong> the factory quoted \u2014 a case that is too hot to hold at 25 \u00b0C ambient is a design that will fold back in a summer cabinet. For programs with service obligations, extend the run: a 72-hour load run on the sample catches early-life failures the same way our <a href=\"https:\/\/www.paiyipower.com\/industrial-power-supply-applications\/\">burn-in and aging racks<\/a> do before shipment.<\/p>\n<hr>\n<h2 style=\"border-bottom: 2px solid #1264a3; padding-bottom: 6px; margin-top: 36px;\" id=\"the-golden-sample-seal-it-sign-it-keep-it\">The golden sample: seal it, sign it, keep it<\/h2>\n<p>When the sample passes, that physical unit becomes the <strong>golden sample<\/strong> \u2014 the production reference both sides agreed to. Bag it, label it with date and signatures, and keep it somewhere safe; require the factory to keep its own signed copy too. Every future shipment dispute, every change-control question, every second-source quote gets answered by comparing against the golden sample. Then, before production, put the relationship terms in writing \u2014 see <a href=\"https:\/\/www.paiyipower.com\/power-adapter-oem-agreement-guide\/\">our OEM agreement guide<\/a> for the five clauses that matter.<\/p>\n<hr>\n<h2 style=\"border-bottom: 2px solid #1264a3; padding-bottom: 6px; margin-top: 36px;\" id=\"common-sample-stage-mistakes\">Common mistakes in power adapter sample evaluation<\/h2>\n<ul>\n<li><strong>Approving on a phone call:<\/strong> &#8220;the sample looks good&#8221; is not an approval; the checklist is.<\/li>\n<li><strong>Testing only at nominal input:<\/strong> low-line 90 V and high-line 264 V behave differently.<\/li>\n<li><strong>Skipping the paperwork:<\/strong> approving a sample whose report names a different model.<\/li>\n<li><strong>No golden sample:<\/strong> production drifts, and there is no reference to compare against.<\/li>\n<li><strong>Approving without your cable in the loop:<\/strong> ripple and drop change with the cable \u2014 test with the real one.<\/li>\n<\/ul>\n<hr>\n<figure style=\"width: 768px\" class=\"wp-caption alignnone\"><img fetchpriority=\"high\" decoding=\"async\" class=\"size-large wp-image-1080\" src=\"https:\/\/www.paiyipower.com\/wp-content\/uploads\/2026\/09\/pyi-factory-burnin-station.webp\" alt=\"burn-in station running sample units under load\" width=\"768\" height=\"576\" srcset=\"https:\/\/www.paiyipower.com\/wp-content\/uploads\/2026\/09\/pyi-factory-burnin-station.webp 1600w, https:\/\/www.paiyipower.com\/wp-content\/uploads\/2026\/09\/pyi-factory-burnin-station-300x225.webp 300w, https:\/\/www.paiyipower.com\/wp-content\/uploads\/2026\/09\/pyi-factory-burnin-station-1024x768.webp 1024w, https:\/\/www.paiyipower.com\/wp-content\/uploads\/2026\/09\/pyi-factory-burnin-station-768x576.webp 768w, https:\/\/www.paiyipower.com\/wp-content\/uploads\/2026\/09\/pyi-factory-burnin-station-1536x1152.webp 1536w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><\/figure>\n<figure style=\"width: 768px\" class=\"wp-caption alignnone\"><img decoding=\"async\" class=\"size-large wp-image-1083\" src=\"https:\/\/www.paiyipower.com\/wp-content\/uploads\/2026\/09\/pyi-factory-aging-chamber.webp\" alt=\"aging chamber used for extended sample runs\" width=\"768\" height=\"348\" srcset=\"https:\/\/www.paiyipower.com\/wp-content\/uploads\/2026\/09\/pyi-factory-aging-chamber.webp 1600w, https:\/\/www.paiyipower.com\/wp-content\/uploads\/2026\/09\/pyi-factory-aging-chamber-300x136.webp 300w, https:\/\/www.paiyipower.com\/wp-content\/uploads\/2026\/09\/pyi-factory-aging-chamber-1024x465.webp 1024w, https:\/\/www.paiyipower.com\/wp-content\/uploads\/2026\/09\/pyi-factory-aging-chamber-768x348.webp 768w, https:\/\/www.paiyipower.com\/wp-content\/uploads\/2026\/09\/pyi-factory-aging-chamber-1536x697.webp 1536w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><\/figure>\n<figure style=\"width: 768px\" class=\"wp-caption alignnone\"><img decoding=\"async\" class=\"size-large wp-image-1077\" src=\"https:\/\/www.paiyipower.com\/wp-content\/uploads\/2026\/09\/pyi-factory-workshop.webp\" alt=\"assembly workshop where power adapter samples are built\" width=\"768\" height=\"576\" srcset=\"https:\/\/www.paiyipower.com\/wp-content\/uploads\/2026\/09\/pyi-factory-workshop.webp 1600w, https:\/\/www.paiyipower.com\/wp-content\/uploads\/2026\/09\/pyi-factory-workshop-300x225.webp 300w, https:\/\/www.paiyipower.com\/wp-content\/uploads\/2026\/09\/pyi-factory-workshop-1024x768.webp 1024w, https:\/\/www.paiyipower.com\/wp-content\/uploads\/2026\/09\/pyi-factory-workshop-768x576.webp 768w, https:\/\/www.paiyipower.com\/wp-content\/uploads\/2026\/09\/pyi-factory-workshop-1536x1152.webp 1536w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><\/figure>\n<h2 style=\"border-bottom: 2px solid #1264a3; padding-bottom: 6px; margin-top: 36px;\" id=\"frequently-asked-questions\">Frequently asked questions<\/h2>\n<h3 style=\"margin-top: 24px; color: #2f6b4f;\">How many samples should I ask for?<\/h3>\n<p><strong>Two to three.<\/strong> One to test to destruction if needed, one to keep as the golden sample, one as a spare. We supply samples with the model-specific report attached.<\/p>\n<h3 style=\"margin-top: 24px; color: #2f6b4f;\">Do I need an electronic load to evaluate a sample?<\/h3>\n<p><strong>A load is strongly recommended<\/strong> \u2014 resistive loads (power resistors, bulbs) work for basic checks, but an electronic load gives clean steps for transient and current-limit tests.<\/p>\n<h3 style=\"margin-top: 24px; color: #2f6b4f;\">How long does sample evaluation take?<\/h3>\n<p><strong>Half a day for the full checklist<\/strong> plus 2\u20134 hours of loaded run. Most of it is bench time with standard equipment.<\/p>\n<h3 style=\"margin-top: 24px; color: #2f6b4f;\">What if the sample fails one line?<\/h3>\n<p><strong>Document it and send it back with the measurement.<\/strong> A factory worth working with responds with root cause and a revised sample; a factory that argues without data has answered a different question about itself.<\/p>\n<h3 style=\"margin-top: 24px; color: #2f6b4f;\">Is the sample tested for EMC?<\/h3>\n<p><strong>Sample-stage EMC is a pre-compliance scan if you need it<\/strong> \u2014 formal EMC runs on production-intent units at a lab. See <a href=\"https:\/\/www.paiyipower.com\/power-adapter-certification-by-country\/\">certification by country<\/a> for the market layer.<\/p>\n<h3 style=\"margin-top: 24px; color: #2f6b4f;\">Should the factory do the evaluation instead?<\/h3>\n<p><strong>The factory tests 100% of units anyway \u2014 but that is not your evaluation.<\/strong> Your checklist verifies the unit against <em>your<\/em> device, cable and market; the two overlap but are not the same.<\/p>\n<h3 style=\"margin-top: 24px; color: #2f6b4f;\">Does sample evaluation apply to catalogue adapters too?<\/h3>\n<p><strong>Yes, scaled down.<\/strong> Even a private-label unit gets paperwork verification, output check, ripple at load and a fit check \u2014 a catalogue label changes nothing about your return rate.<\/p>\n<h3 style=\"margin-top: 24px; color: #2f6b4f;\">What MOQ applies after sample approval?<\/h3>\n<p><strong>From 200 pcs per model at Paiyi Power, 5\u20136 weeks to first production.<\/strong> Modified-standard designs usually need no tooling \u2014 see <a href=\"https:\/\/www.paiyipower.com\/low-moq-power-adapter-oem\/\">our low-MOQ guide<\/a>.<\/p>\n<hr>\n<h2 style=\"border-bottom: 2px solid #1264a3; padding-bottom: 6px; margin-top: 36px;\" id=\"sources\">Sources<\/h2>\n<ul>\n<li><a href=\"https:\/\/www.iec.ch\/\" rel=\"noopener\" target=\"_blank\">IEC \u2014 62368-1 safety standard family<\/a><\/li>\n<li><a href=\"https:\/\/ista.org\/\" rel=\"noopener\" target=\"_blank\">ISTA \u2014 transit test procedures (packaging)<\/a><\/li>\n<li><a href=\"https:\/\/www.energy.gov\/eere\/buildings\/external-power-supplies\" rel=\"noopener\" target=\"_blank\">U.S. DOE \u2014 External Power Supply efficiency (Level VI)<\/a><\/li>\n<\/ul>\n<p><em>Related on this blog: <a href=\"https:\/\/www.paiyipower.com\/how-to-test-power-supply\/\">how to test a power supply<\/a>, <a href=\"https:\/\/www.paiyipower.com\/power-adapter-oem-agreement-guide\/\">power adapter OEM agreement guide<\/a>, <a href=\"https:\/\/www.paiyipower.com\/low-moq-power-adapter-oem\/\">low MOQ power adapter OEM\/ODM<\/a>.<\/em><\/p>\n<p><!-- faq-schema-v1 --><script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"How many samples should I ask for?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Two to three. One to test to destruction if needed, one to keep as the golden sample, one as a spare. We supply samples with the model-specific report attached.\"}},{\"@type\":\"Question\",\"name\":\"Do I need an electronic load to evaluate a sample?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"A load is strongly recommended \u2014 resistive loads (power resistors, bulbs) work for basic checks, but an electronic load gives clean steps for transient and current-limit tests.\"}},{\"@type\":\"Question\",\"name\":\"How long does sample evaluation take?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Half a day for the full checklist plus 2\u20134 hours of loaded run. Most of it is bench time with standard equipment.\"}},{\"@type\":\"Question\",\"name\":\"What if the sample fails one line?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Document it and send it back with the measurement. A factory worth working with responds with root cause and a revised sample; a factory that argues without data has answered a different question about itself.\"}},{\"@type\":\"Question\",\"name\":\"Is the sample tested for EMC?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Sample-stage EMC is a pre-compliance scan if you need it \u2014 formal EMC runs on production-intent units at a lab. See certification by country for the market layer.\"}},{\"@type\":\"Question\",\"name\":\"Should the factory do the evaluation instead?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The factory tests 100% of units anyway \u2014 but that is not your evaluation. Your checklist verifies the unit against your device, cable and market; the two overlap but are not the same.\"}},{\"@type\":\"Question\",\"name\":\"Does sample evaluation apply to catalogue adapters too?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Yes, scaled down. Even a private-label unit gets paperwork verification, output check, ripple at load and a fit check \u2014 a catalogue label changes nothing about your return rate.\"}},{\"@type\":\"Question\",\"name\":\"What MOQ applies after sample approval?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"From 200 pcs per model at Paiyi Power, 5\u20136 weeks to first production. Modified-standard designs usually need no tooling \u2014 see our low-MOQ guide.\"}}]}<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Power Adapter Sample Evaluation: The Checklist to Run Before You Approve Production Published: September 2026Reading time: 8 minAudience: brand owners, hardware engineers and procurement teams evaluating first samples from a power adapter factory before approving mass production By Han \u2014 Paiyi Power, an OEM\/ODM power adapter manufacturer that supplies model-specific test reports with every sample. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1082,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[],"class_list":["post-1306","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-services"],"_links":{"self":[{"href":"https:\/\/www.paiyipower.com\/pt\/wp-json\/wp\/v2\/posts\/1306","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.paiyipower.com\/pt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.paiyipower.com\/pt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.paiyipower.com\/pt\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.paiyipower.com\/pt\/wp-json\/wp\/v2\/comments?post=1306"}],"version-history":[{"count":1,"href":"https:\/\/www.paiyipower.com\/pt\/wp-json\/wp\/v2\/posts\/1306\/revisions"}],"predecessor-version":[{"id":1310,"href":"https:\/\/www.paiyipower.com\/pt\/wp-json\/wp\/v2\/posts\/1306\/revisions\/1310"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.paiyipower.com\/pt\/wp-json\/wp\/v2\/media\/1082"}],"wp:attachment":[{"href":"https:\/\/www.paiyipower.com\/pt\/wp-json\/wp\/v2\/media?parent=1306"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.paiyipower.com\/pt\/wp-json\/wp\/v2\/categories?post=1306"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.paiyipower.com\/pt\/wp-json\/wp\/v2\/tags?post=1306"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}