
		{"id":606,"date":"2026-08-01T00:27:09","date_gmt":"2026-07-31T16:27:09","guid":{"rendered":"https:\/\/www.paiyipower.com\/?p=606"},"modified":"2026-09-09T12:22:51","modified_gmt":"2026-09-09T04:22:51","slug":"custom-power-strip-manufacturing","status":"publish","type":"post","link":"https:\/\/www.paiyipower.com\/pt\/custom-power-strip-manufacturing\/","title":{"rendered":"Fabrica\u00e7\u00e3o de R\u00e9guas de Energia Personalizadas: Guia OEM\/ODM para Compradores B2B"},"content":{"rendered":"<h1>Custom Power Strip Manufacturing: OEM\/ODM Guide for B2B Buyers<\/h1>\n<p><strong>Published:<\/strong> September 2026<br \/>\n<strong>Reading time:<\/strong> 7 min<br \/>\n<strong>Audience:<\/strong> brands, distributors, importers and procurement teams sourcing custom power strips, power bars and GaN charging stations<\/p>\n<p><strong>By Han \u2014 Paiyi Power<\/strong>, an OEM\/ODM manufacturer of GaN chargers, power adapters and custom power strips, building low-MOQ programmes for international B2B buyers.<br \/>\n<strong>Last updated: 7 September 2026.<\/strong><\/p>\n<hr \/>\n<div class=\"wp-block-rank-math-toc-block\" id=\"rank-math-toc\" style=\"background:#f5f7f8;border:1px solid #d9dee3;border-radius:6px;padding:16px 20px;margin:28px 0;\">\n<h2 style=\"font-size:18px;margin:0 0 10px;border:none;padding:0;\">Contents<\/h2>\n<nav>\n<ul style=\"margin:0;padding-left:20px;\">\n<li style=\"margin:4px 0;\"><a href=\"#direct-answer-what-is-custom-power-strip-manufacturing\">Direct answer: what is custom power strip manufacturing?<\/a><\/li>\n<li style=\"margin:4px 0;\"><a href=\"#what-is-custom-power-strip-manufacturing\">What is custom power strip manufacturing?<\/a><\/li>\n<li style=\"margin:4px 0;\"><a href=\"#what-can-you-customise-on-a-power-strip\">What can you customise on a power strip?<\/a><\/li>\n<li style=\"margin:4px 0;\"><a href=\"#typical-moq-by-customization-depth\">Typical MOQ by customization depth<\/a><\/li>\n<li style=\"margin:4px 0;\"><a href=\"#realistic-timeline-for-a-custom-power-strip-order\">Realistic timeline for a custom power strip order<\/a><\/li>\n<li style=\"margin:4px 0;\"><a href=\"#materials-safety-and-market-compliance\">Materials, safety and market compliance<\/a><\/li>\n<li style=\"margin:4px 0;\"><a href=\"#how-to-evaluate-a-custom-power-strip-manufacturer\">How to evaluate a custom power strip manufacturer<\/a><\/li>\n<li style=\"margin:4px 0;\"><a href=\"#case-study-24-000-unit-custom-gan-power-strip-for-a-russian-client\">Case study: 24,000-unit custom GaN power strip for a Russian client<\/a><\/li>\n<li style=\"margin:4px 0;\"><a href=\"#paiyi-power-custom-power-strip-manufacturing-profile\">Paiyi Power: custom power strip manufacturing profile<\/a><\/li>\n<li style=\"margin:4px 0;\"><a href=\"#frequently-asked-questions-about-custom-power-strip-manufacturing\">Frequently asked questions about custom power strip manufacturing<\/a><\/li>\n<li style=\"margin:4px 0;\"><a href=\"#conclusion\">Conclusion<\/a><\/li>\n<li style=\"margin:4px 0;\"><a href=\"#sources-and-further-reading\">Sources and further reading<\/a><\/li>\n<\/ul>\n<\/nav>\n<\/div>\n<h2 style=\"border-bottom: 2px solid #1264a3; padding-bottom: 6px; margin-top: 36px;\" id=\"direct-answer-what-is-custom-power-strip-manufacturing\">Direct answer: what is custom power strip manufacturing?<\/h2>\n<p><strong>Custom power strip manufacturing means an OEM\/ODM factory builds a power strip (power bar \/ extension block) to your brand and your specification<\/strong> \u2014 output power, the number and type of AC outlets and USB ports, plug standard, cord length, surge protection, housing and the certifications required for your market. At Paiyi Power, the standard MOQ is <strong>200 pcs per model<\/strong> on existing platforms, lead time is <strong>5\u20136 weeks<\/strong> from order to shipment, and <strong>every unit is 100% inspected<\/strong> before dispatch. New tooling or a new market certification raises both the minimum quantity and the timeline.<\/p>\n<hr \/>\n<h2 style=\"border-bottom: 2px solid #1264a3; padding-bottom: 6px; margin-top: 36px;\" id=\"what-is-custom-power-strip-manufacturing\">What is custom power strip manufacturing?<\/h2>\n<p>A <strong>custom power strip<\/strong> is a power-distribution product made to a buyer&#8217;s specification rather than bought off a distributor&#8217;s shelf. The difference from a standard product is threefold:<\/p>\n<ul>\n<li><strong>White-label<\/strong> \u2014 you take an existing strip and put your logo on the carton. Lowest cost, fastest, but the product itself is unchanged.<\/li>\n<li><strong>Customised OEM<\/strong> \u2014 you change the plug, the port mix, the cord, the housing colour and the packaging on a factory&#8217;s existing platform. This is where most B2B buyers get real differentiation.<\/li>\n<li><strong>Full ODM<\/strong> \u2014 the factory designs a new platform (new PCB, new housing, new certification) for you. Highest cost and longest lead time, but the product is uniquely yours.<\/li>\n<\/ul>\n<p>For most small and mid-size brands, <strong>customised OEM on an existing platform is the sweet spot<\/strong>: you get a product that looks and performs like your own, without paying for a new design from scratch.<\/p>\n<h2 style=\"border-bottom: 2px solid #1264a3; padding-bottom: 6px; margin-top: 36px;\" id=\"what-can-you-customise-on-a-power-strip\">What can you customise on a power strip?<\/h2>\n<p>On an existing platform, these elements are normally adjustable:<\/p>\n<table style=\"border-collapse: collapse; width: 100%; margin: 18px 0; font-size: 14px;\">\n<thead>\n<tr>\n<th style=\"background: #f5f7f8; border: 1px solid #d9dee3; padding: 9px 11px; text-align: left;\">Element<\/th>\n<th style=\"background: #f5f7f8; border: 1px solid #d9dee3; padding: 9px 11px; text-align: left;\">What is possible<\/th>\n<th style=\"background: #f5f7f8; border: 1px solid #d9dee3; padding: 9px 11px; text-align: left;\">Typical impact<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\"><strong>Branding &amp; packaging<\/strong><\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Laser engraving, silk-screen logo, custom carton and manual language<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Lowest cost; included at low MOQ<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\"><strong>AC outlets &amp; plug<\/strong><\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Outlet count (2\u20138) and plug type: EU, UK, US, AU, BR, universal<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Plug moulds usually exist; new plug raises MOQ<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\"><strong>USB ports<\/strong><\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">USB-C (PD), USB-A, or a mix such as 2C+1A, up to ~100\u2013165W shared<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Charging module is a standard building block<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\"><strong>Charging module<\/strong><\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">GaN, USB PD 3.2 (SPR AVS) ready, 30W\u2013165W<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Higher wattage = more components<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\"><strong>Surge protection<\/strong><\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">SPD Type 3, 3kV\u20136kV integrated<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Expected for office and industrial use<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\"><strong>Cord length &amp; rating<\/strong><\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">1.5m \/ 3m \/ 5m; 10A\u201316A, up to 4000W<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Cord grade affects cost<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\"><strong>Housing<\/strong><\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Colour, label window, wall-mount or desktop<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Colour change is cheap; new shell is not<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\"><strong>Certifications<\/strong><\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">CE, FCC, RoHS, EAC, UL, UKCA per market<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Certificate copies provided per model<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2 style=\"border-bottom: 2px solid #1264a3; padding-bottom: 6px; margin-top: 36px;\" id=\"typical-moq-by-customization-depth\">Typical MOQ by customization depth<\/h2>\n<p>Every layer of customisation adds fixed cost. This table is a general industry guide \u2014 confirm the real minimum with each factory, because it varies with their product platforms:<\/p>\n<table style=\"border-collapse: collapse; width: 100%; margin: 18px 0; font-size: 14px;\">\n<thead>\n<tr>\n<th style=\"background: #f5f7f8; border: 1px solid #d9dee3; padding: 9px 11px; text-align: left;\">Level of customisation<\/th>\n<th style=\"background: #f5f7f8; border: 1px solid #d9dee3; padding: 9px 11px; text-align: left;\">Typical MOQ<\/th>\n<th style=\"background: #f5f7f8; border: 1px solid #d9dee3; padding: 9px 11px; text-align: left;\">What is involved<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Rebrand \/ custom packaging on an existing model<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">200\u2013500 pcs<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Labels, cartons, manual language, shell colour<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Plug variant or cable change<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">300\u20131,000 pcs<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Plug moulds usually exist; new moulds raise the number<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">New plastic shell, same electronics<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">1,000\u20133,000 pcs<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Injection tooling (USD several thousand) drives the minimum<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">New PCB \/ new power stage<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">1,000\u20135,000 pcs<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Engineering, EMC pre-testing and component procurement<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">New platform + new certification<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">3,000\u201310,000 pcs<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Test-laboratory fees and certification cycles must be recovered<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>At Paiyi Power, standard MOQ is <strong>200 pcs per model<\/strong> on existing platforms, and we quote the higher minimums above transparently when a project needs new tooling or certification.<\/p>\n<h2 style=\"border-bottom: 2px solid #1264a3; padding-bottom: 6px; margin-top: 36px;\" id=\"realistic-timeline-for-a-custom-power-strip-order\">Realistic timeline for a custom power strip order<\/h2>\n<p>For a re-brand or light-customisation order on an existing platform, the typical sequence is:<\/p>\n<table style=\"border-collapse: collapse; width: 100%; margin: 18px 0; font-size: 14px;\">\n<thead>\n<tr>\n<th style=\"background: #f5f7f8; border: 1px solid #d9dee3; padding: 9px 11px; text-align: left;\">Stage<\/th>\n<th style=\"background: #f5f7f8; border: 1px solid #d9dee3; padding: 9px 11px; text-align: left;\">Typical duration<\/th>\n<th style=\"background: #f5f7f8; border: 1px solid #d9dee3; padding: 9px 11px; text-align: left;\">Notes<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Samples and quotation<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">1\u20132 weeks<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">You approve the sample and artwork<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Tooling or packaging preparation<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">1\u20132 weeks<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Only if labels or packaging must be produced<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Mass production<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">2\u20134 weeks<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Paiyi Power lead time: 5\u20136 weeks total from order to shipment<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Pre-shipment inspection and shipping<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">1\u20132 weeks<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">100% inspection at Paiyi Power before dispatch<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2 style=\"border-bottom: 2px solid #1264a3; padding-bottom: 6px; margin-top: 36px;\" id=\"materials-safety-and-market-compliance\">Materials, safety and market compliance<\/h2>\n<p>A power strip is a safety-critical product, so certifications are not optional in regulated markets. The common ones:<\/p>\n<ul>\n<li><strong>CE<\/strong> (European Union) \u2014 covers LVD and EMC for the EU market.<\/li>\n<li><strong>FCC<\/strong> (United States) \u2014 electromagnetic compatibility for the US.<\/li>\n<li><strong>RoHS<\/strong> \u2014 restriction of hazardous substances in the EU and many other markets.<\/li>\n<li><strong>EAC<\/strong> \u2014 the Eurasian Conformity mark for Russia, Belarus and Kazakhstan (EAEU).<\/li>\n<li><strong>UL \/ ETL<\/strong> \u2014 safety certification widely expected in North America.<\/li>\n<li><strong>UKCA<\/strong> \u2014 the post-Brexit UK marking.<\/li>\n<\/ul>\n<p>Paiyi Power arranges the certificates required for the target market and provides the PDF copies per model and per market. For the charging module, <strong>USB PD 3.2 (SPR AVS) ready GaN designs are available<\/strong>; certification status varies by SKU and production batch, and earlier runs were certified under USB PD 3.1 \u2014 we send the current certificate for the exact model you source rather than making a blanket claim.<\/p>\n<h2 style=\"border-bottom: 2px solid #1264a3; padding-bottom: 6px; margin-top: 36px;\" id=\"how-to-evaluate-a-custom-power-strip-manufacturer\">How to evaluate a custom power strip manufacturer<\/h2>\n<p>Because most orders are placed with factories you have not visited, ask these questions in writing and insist on documents:<\/p>\n<ol>\n<li><strong>\u201cWhat is your true MOQ per model, and what does it include?\u201d<\/strong> \u2014 MOQ of 200 means nothing if labels and packaging are excluded and cost double.<\/li>\n<li><strong>\u201cCan I see your factory data \u2014 lines, capacity, staff and inspection process?\u201d<\/strong> \u2014 a factory should answer with numbers, not adjectives.<\/li>\n<li><strong>\u201cWhich certificates do you actually hold, and can you send the PDFs?\u201d<\/strong> \u2014 held certificates should be shown; \u201cavailable on request\u201d should be priced and timed.<\/li>\n<li><strong>\u201cWhat testing happens on a 200-piece batch?\u201d<\/strong> \u2014 the answer should be identical to a 20,000-piece batch.<\/li>\n<li><strong>\u201cWhat is your lead time from PO to shipment, and what happens in peak season?\u201d<\/strong><\/li>\n<li><strong>\u201cWhat Incoterms do you quote?\u201d<\/strong> \u2014 EXW, FOB or DAP change your landed cost more than the unit price.<\/li>\n<li><strong>\u201cWhat are the payment terms?\u201d<\/strong> \u2014 typically 30% deposit \/ 70% before shipment; anything unusual deserves a second look.<\/li>\n<\/ol>\n<h2 style=\"border-bottom: 2px solid #1264a3; padding-bottom: 6px; margin-top: 36px;\" id=\"case-study-24-000-unit-custom-gan-power-strip-for-a-russian-client\">Case study: 24,000-unit custom GaN power strip for a Russian client<\/h2>\n<p>This is a real order completed by Paiyi Power in 2026. It shows what customisation at scale looks like on an existing platform.<\/p>\n<h3 style=\"margin-top: 24px; color: #2f6b4f;\">The challenge<\/h3>\n<p>In early 2026, a Russian client needed a large-volume custom power strip \u2014 <strong>24,000 units<\/strong> \u2014 with specific branding, packaging and technical requirements, delivered in <strong>6 weeks<\/strong>. It was not an off-the-shelf product. They needed: custom branding (logo engraving and packaging), GaN fast-charging integrated into the strip, selectable cord lengths, surge protection for equipment safety, and full compliance with Russian (EAC) requirements.<\/p>\n<h3 style=\"margin-top: 24px; color: #2f6b4f;\">The solution<\/h3>\n<p>Our engineering team proposed a multifunction power strip built around GaN charging technology. The final specification:<\/p>\n<table style=\"border-collapse: collapse; width: 100%; margin: 18px 0; font-size: 14px;\">\n<thead>\n<tr>\n<th style=\"background: #f5f7f8; border: 1px solid #d9dee3; padding: 9px 11px; text-align: left;\">Specification<\/th>\n<th style=\"background: #f5f7f8; border: 1px solid #d9dee3; padding: 9px 11px; text-align: left;\">Detail<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\"><strong>Total output<\/strong><\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">65W (GaN-based)<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\"><strong>AC outlets<\/strong><\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">5 outlets (universal \/ customised plug types)<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\"><strong>USB ports<\/strong><\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">2 \u00d7 USB-C + 1 \u00d7 USB-A (configurable)<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\"><strong>Surge protection<\/strong><\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">SPD Type 3, 6kV integrated<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\"><strong>Rated power<\/strong><\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">16A \/ 4000W<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\"><strong>Cord length<\/strong><\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">1.5m \/ 3m \/ 5m options<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\"><strong>Customisation<\/strong><\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Full branding (laser engraving) + custom packaging<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\"><strong>Certifications<\/strong><\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">CE, FCC, RoHS, EAC (Russian) arranged<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3 style=\"margin-top: 24px; color: #2f6b4f;\">The execution<\/h3>\n<ul>\n<li><strong>Phase 1 \u2013 Samples (Week 1\u20132):<\/strong> prototypes with the client&#8217;s logo and packaging, full functional testing, shipped for approval.<\/li>\n<li><strong>Phase 2 \u2013 Sourcing &amp; production (Week 3\u20134):<\/strong> bulk material procurement, lines ramped with 100% testing protocols.<\/li>\n<li><strong>Phase 3 \u2013 Quality control (Week 5):<\/strong> IQC incoming inspection, IPQC in-process, 100% functional test, OQC with AQL sampling.<\/li>\n<li><strong>Phase 4 \u2013 Shipment (Week 6):<\/strong> all 24,000 units packed, palletised and shipped on time.<\/li>\n<\/ul>\n<h3 style=\"margin-top: 24px; color: #2f6b4f;\">The result<\/h3>\n<p><strong>24,000 fully customised units, delivered in 6 weeks<\/strong>, with 100% pre-shipment inspection and EAC compliance. It is a concrete example that customisation at scale is achievable on an existing platform when planning and supply-chain coordination are done up front.<\/p>\n<figure class=\"wp-caption alignnone\" style=\"width: 768px;\"><img fetchpriority=\"high\" decoding=\"async\" class=\"size-large wp-image-1078\" src=\"https:\/\/www.paiyipower.com\/wp-content\/uploads\/2026\/09\/pyi-factory-assembly-line-768x1024.webp\" alt=\"Paiyi Power custom power strip OEM manufacturing and assembly line\" width=\"768\" height=\"1024\" srcset=\"https:\/\/www.paiyipower.com\/wp-content\/uploads\/2026\/09\/pyi-factory-assembly-line-768x1024.webp 768w, https:\/\/www.paiyipower.com\/wp-content\/uploads\/2026\/09\/pyi-factory-assembly-line-225x300.webp 225w, https:\/\/www.paiyipower.com\/wp-content\/uploads\/2026\/09\/pyi-factory-assembly-line-1152x1536.webp 1152w, https:\/\/www.paiyipower.com\/wp-content\/uploads\/2026\/09\/pyi-factory-assembly-line.webp 1200w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><figcaption class=\"wp-caption-text\">Paiyi Power custom power strip OEM manufacturing and assembly line<\/figcaption><\/figure>\n<h2 style=\"border-bottom: 2px solid #1264a3; padding-bottom: 6px; margin-top: 36px;\" id=\"paiyi-power-custom-power-strip-manufacturing-profile\">Paiyi Power: custom power strip manufacturing profile<\/h2>\n<p><strong>Paiyi Power is an <a href=\"https:\/\/www.paiyipower.com\/about-us\/why-paiyi-oem-advantages\/\">OEM\/ODM power adapter and power strip manufacturer<\/a> based in China. The figures below are our own factory data, current as of September 2026.<\/strong><\/p>\n<table style=\"border-collapse: collapse; width: 100%; margin: 18px 0; font-size: 14px;\">\n<thead>\n<tr>\n<th style=\"background: #f5f7f8; border: 1px solid #d9dee3; padding: 9px 11px; text-align: left;\">Item<\/th>\n<th style=\"background: #f5f7f8; border: 1px solid #d9dee3; padding: 9px 11px; text-align: left;\">Paiyi Power<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\"><strong>Standard MOQ<\/strong><\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\"><strong>200 pcs per model<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Monthly capacity<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Up to 150,000 pcs<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Production lines<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">4<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Employees<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">50<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Lead time<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">5\u20136 weeks from order to shipment<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Pre-shipment inspection<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">100% of units<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Quality system<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\"><a href=\"https:\/\/www.paiyipower.com\/certifications\/\">ISO 9001<\/a>, with certification documents per market and model<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">Product range<\/td>\n<td style=\"border: 1px solid #d9dee3; padding: 9px 11px;\">USB PD 3.2 \/ SPR AVS GaN chargers (100W\u2013165W), power adapters and custom power strips<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong>One thing we state plainly:<\/strong> our low MOQ applies to orders built on our existing platforms, which is exactly what a custom-strip buyer needs. If your project needs a new platform or a new market certification, we quote the real MOQ, the real tooling cost and the real timeline before you commit \u2014 the numbers above are not marketing, they are the production floor.<\/p>\n<hr \/>\n<h2 style=\"border-bottom: 2px solid #1264a3; padding-bottom: 6px; margin-top: 36px;\" id=\"frequently-asked-questions-about-custom-power-strip-manufacturing\">Frequently asked questions about custom power strip manufacturing<\/h2>\n<h3 style=\"margin-top: 24px; color: #2f6b4f;\">What is custom power strip manufacturing?<\/h3>\n<p><strong>It is an OEM\/ODM factory building a power strip to your brand and your spec<\/strong> \u2014 output, outlets, USB ports, plug, cord, surge protection, housing and market certifications \u2014 rather than you reselling a generic shelf product.<\/p>\n<h3 style=\"margin-top: 24px; color: #2f6b4f;\">What is the minimum order quantity (MOQ)?<\/h3>\n<p><strong>On existing platforms, 200\u2013500 pcs is achievable; Paiyi Power&#8217;s standard MOQ is 200 pcs per model.<\/strong> Below that you are usually buying stock with a private label, not a true custom order.<\/p>\n<h3 style=\"margin-top: 24px; color: #2f6b4f;\">Can I customise the plug for my market?<\/h3>\n<p><strong>Often yes, if the factory already holds that plug mould.<\/strong> EU, UK, US, Australian and Brazilian plugs exist on most export platforms; a brand-new plug mould raises the MOQ.<\/p>\n<h3 style=\"margin-top: 24px; color: #2f6b4f;\">Can a custom power strip include GaN USB-C charging?<\/h3>\n<p><strong>Yes.<\/strong> GaN charging modules with USB PD (including PD 3.2 \/ SPR AVS ready designs up to ~165W) are standard building blocks and can be combined with AC outlets in one strip.<\/p>\n<h3 style=\"margin-top: 24px; color: #2f6b4f;\">Do you provide surge protection?<\/h3>\n<p><strong>Yes.<\/strong> Integrated SPD Type 3 surge protection (commonly 3kV\u20136kV) is available and is recommended for office, industrial and medical environments.<\/p>\n<h3 style=\"margin-top: 24px; color: #2f6b4f;\">Which certifications can you arrange?<\/h3>\n<p><strong>CE, FCC, RoHS, EAC, UL\/ETL and UKCA, depending on the target market.<\/strong> We provide the actual certificate PDFs per model and market \u2014 ask for them and verify them.<\/p>\n<h3 style=\"margin-top: 24px; color: #2f6b4f;\">How long does a custom power strip order take?<\/h3>\n<p><strong>Typically 4\u20137 weeks from order to shipment for a re-brand or light-customisation order.<\/strong> Paiyi Power quotes 5\u20136 weeks, including 100% pre-shipment inspection.<\/p>\n<h3 style=\"margin-top: 24px; color: #2f6b4f;\">Is a small order tested as thoroughly as a large one?<\/h3>\n<p><strong>It should be, and that is a test of the factory, not the order size.<\/strong> Ask for the batch test procedure in writing before you place the order.<\/p>\n<h3 style=\"margin-top: 24px; color: #2f6b4f;\">Why choose an OEM\/ODM factory instead of a trading company?<\/h3>\n<p><strong>A factory answers with its own production data, controls tooling and testing, and can customise deeper at lower cost.<\/strong> A trader resells what a factory already makes; for real customisation, go to the source.<\/p>\n<hr \/>\n<figure id=\"attachment_1076\" aria-describedby=\"caption-attachment-1076\" style=\"width: 1024px\" class=\"wp-caption alignnone\"><img decoding=\"async\" class=\"size-large wp-image-1076\" src=\"https:\/\/www.paiyipower.com\/wp-content\/uploads\/2026\/09\/pyi-factory-warehouse-1024x767.webp\" alt=\"Finished goods warehouse at Paiyi Power\" width=\"1024\" height=\"767\" srcset=\"https:\/\/www.paiyipower.com\/wp-content\/uploads\/2026\/09\/pyi-factory-warehouse-1024x767.webp 1024w, https:\/\/www.paiyipower.com\/wp-content\/uploads\/2026\/09\/pyi-factory-warehouse-300x225.webp 300w, https:\/\/www.paiyipower.com\/wp-content\/uploads\/2026\/09\/pyi-factory-warehouse-768x576.webp 768w, https:\/\/www.paiyipower.com\/wp-content\/uploads\/2026\/09\/pyi-factory-warehouse-1536x1151.webp 1536w, https:\/\/www.paiyipower.com\/wp-content\/uploads\/2026\/09\/pyi-factory-warehouse.webp 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption id=\"caption-attachment-1076\" class=\"wp-caption-text\">Finished-goods warehouse with daily shipment pallets<\/figcaption><\/figure>\n<h2 style=\"border-bottom: 2px solid #1264a3; padding-bottom: 6px; margin-top: 36px;\" id=\"conclusion\">Conclusion<\/h2>\n<p><strong>Custom power strip manufacturing is a practical way for brands to launch a differentiated product<\/strong> \u2014 if you understand what changes at 200 pieces and what does not. The unit price and the customisation depth change. Quality, testing and documentation should not.<\/p>\n<p>Ask for numbers, ask for documents, and choose a factory that answers both. That is the entire game at low volume.<\/p>\n<hr \/>\n<h2 style=\"border-bottom: 2px solid #1264a3; padding-bottom: 6px; margin-top: 36px;\" id=\"sources-and-further-reading\">Sources and further reading<\/h2>\n<p>This article was written in September 2026. For market access and trade context, the following primary sources apply:<\/p>\n<ul>\n<li><a href=\"https:\/\/commission.europa.eu\/business-economy-euro\/product-safety-and-requirements\/ce-marking_en\" target=\"_blank\" rel=\"noopener\">European Commission \u2014 CE marking<\/a> (product safety and market access in the EU)<\/li>\n<li><a href=\"https:\/\/iccwbo.org\/business-solutions\/incoterms-rules\/\" target=\"_blank\" rel=\"noopener\">ICC \u2014 Incoterms 2020 rules<\/a> (who pays for what between factory and buyer)<\/li>\n<li><a href=\"https:\/\/www.ul.com\/\" target=\"_blank\" rel=\"noopener\">UL Solutions<\/a> (safety certification context for power strips and chargers)<\/li>\n<li><a href=\"https:\/\/www.usb.org\/compliance\" target=\"_blank\" rel=\"noopener\">USB-IF \u2014 Compliance Program<\/a> (PD and charger compliance for USB products)<\/li>\n<\/ul>\n<h3 style=\"margin-top: 24px; color: #2f6b4f;\">Related reading on Paiyi Power<\/h3>\n<ul>\n<li><a href=\"https:\/\/www.paiyipower.com\/gan-chargers-oem-procurement-guide\/\">GaN Chargers OEM Procurement Guide<\/a><\/li>\n<li><a href=\"https:\/\/www.paiyipower.com\/low-moq-power-adapter-oem\/\">Low MOQ Power Adapter OEM\/ODM<\/a><\/li>\n<li><a href=\"https:\/\/www.paiyipower.com\/usb-pd-3-2-spr-avs-vs-pd-3-1\/\">USB PD 3.2: What Changes for Manufacturers and B2B Buyers<\/a><\/li>\n<li><a href=\"https:\/\/www.paiyipower.com\/chinese-power-adapter-manufacturer\/\">Chinese Power Adapter Manufacturer: How to Source<\/a><\/li>\n<li><a href=\"https:\/\/www.paiyipower.com\/contact-us\/\">Contact Paiyi Power<\/a><\/li>\n<\/ul>\n<hr \/>\n<p><em><strong>Paiyi Power<\/strong> is a custom power strip OEM\/ODM manufacturer in China. Standard MOQ 200 pcs per model, 5\u20136 week lead time, 100% pre-shipment inspection.<\/em><\/p>\n<p><strong>Talk to our team<\/strong> about your first custom power strip order.<br \/>\n<!-- faq-schema-v1 --><script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"What is custom power strip manufacturing?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"It is an OEM\/ODM factory building a power strip to your brand and your spec \u2014 output, outlets, USB ports, plug, cord, surge protection, housing and market certifications \u2014 rather than you reselling a generic shelf product.\"}},{\"@type\":\"Question\",\"name\":\"What is the minimum order quantity (MOQ)?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"On existing platforms, 200\u2013500 pcs is achievable; Paiyi Power's standard MOQ is 200 pcs per model. Below that you are usually buying stock with a private label, not a true custom order.\"}},{\"@type\":\"Question\",\"name\":\"Can I customise the plug for my market?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Often yes, if the factory already holds that plug mould. EU, UK, US, Australian and Brazilian plugs exist on most export platforms; a brand-new plug mould raises the MOQ.\"}},{\"@type\":\"Question\",\"name\":\"Can a custom power strip include GaN USB-C charging?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Yes. GaN charging modules with USB PD (including PD 3.2 \/ SPR AVS ready designs up to ~165W) are standard building blocks and can be combined with AC outlets in one strip.\"}},{\"@type\":\"Question\",\"name\":\"Do you provide surge protection?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Yes. Integrated SPD Type 3 surge protection (commonly 3kV\u20136kV) is available and is recommended for office, industrial and medical environments.\"}},{\"@type\":\"Question\",\"name\":\"Which certifications can you arrange?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"CE, FCC, RoHS, EAC, UL\/ETL and UKCA, depending on the target market. We provide the actual certificate PDFs per model and market \u2014 ask for them and verify them.\"}},{\"@type\":\"Question\",\"name\":\"How long does a custom power strip order take?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Typically 4\u20137 weeks from order to shipment for a re-brand or light-customisation order. Paiyi Power quotes 5\u20136 weeks, including 100% pre-shipment inspection.\"}},{\"@type\":\"Question\",\"name\":\"Is a small order tested as thoroughly as a large one?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"It should be, and that is a test of the factory, not the order size. Ask for the batch test procedure in writing before you place the order.\"}},{\"@type\":\"Question\",\"name\":\"Why choose an OEM\/ODM factory instead of a trading company?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"A factory answers with its own production data, controls tooling and testing, and can customise deeper at lower cost. A trader resells what a factory already makes; for real customisation, go to the source.  Finished-goods warehouse with daily shipment pallets\"}}]}<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Custom Power Strip Manufacturing: OEM\/ODM Guide for B2B Buyers Published: September 2026 Reading time: 7 min Audience: brands, distributors, importers and procurement teams sourcing custom power strips, power bars and GaN charging stations By Han \u2014 Paiyi Power, an OEM\/ODM manufacturer of GaN chargers, power adapters and custom power strips, building low-MOQ programmes for international [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1081,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[28],"tags":[],"class_list":["post-606","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-case-studies"],"_links":{"self":[{"href":"https:\/\/www.paiyipower.com\/pt\/wp-json\/wp\/v2\/posts\/606","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.paiyipower.com\/pt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.paiyipower.com\/pt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.paiyipower.com\/pt\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.paiyipower.com\/pt\/wp-json\/wp\/v2\/comments?post=606"}],"version-history":[{"count":5,"href":"https:\/\/www.paiyipower.com\/pt\/wp-json\/wp\/v2\/posts\/606\/revisions"}],"predecessor-version":[{"id":1261,"href":"https:\/\/www.paiyipower.com\/pt\/wp-json\/wp\/v2\/posts\/606\/revisions\/1261"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.paiyipower.com\/pt\/wp-json\/wp\/v2\/media\/1081"}],"wp:attachment":[{"href":"https:\/\/www.paiyipower.com\/pt\/wp-json\/wp\/v2\/media?parent=606"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.paiyipower.com\/pt\/wp-json\/wp\/v2\/categories?post=606"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.paiyipower.com\/pt\/wp-json\/wp\/v2\/tags?post=606"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}