Our Experienced Skilled Team Is Available Around The Clock

USB PD 3.2 Certification Timeline: What the PD 3.1 Closure Means for B2B Buyers

PaiYi Power >> Services >> USB PD 3.2 Certification Timeline: What the PD 3.1 Closure Means for B2B Buyers
Aging test chamber rack at Paiyi Power

USB PD 3.2 Certification Timeline: What the PD 3.1 Closure Means for B2B Buyers

Published: September 2026
Reading time: 6 min
Audience: OEM manufacturers, buyers, importers and brands sourcing USB PD chargers and power supplies

By Han — Paiyi Power, an OEM/ODM manufacturer of GaN chargers and external power supplies, working with international B2B customers on USB-IF certification.
Last updated: 7 September 2026.


Direct answer: is PD 3.1 certification over?

For new end products, yes — the window for certifying to USB PD R3.1 has closed in 2026. USB-IF grants grace periods for end products based on each revision’s publication date: 24 months for end products and 18 months for silicon. Applied by USB-IF authorised test laboratories, that schedule puts the closure of USB PD R3.1 V1.8 in September 2026, and USB PD R3.2 V1.0 in November 2026. The latest published revision, USB PD R3.2 V1.2, was released 20 May 2026. For B2B buyers, the practical rule is simple: source chargers developed on the USB PD 3.2 certification baseline now, and confirm the exact certificate and revision for the model you are buying.


Why certification timing matters

A USB-IF certificate is not a one-time stamp and it is not generic. Three facts decide whether it helps you:

  • It is model-specific. The certificate names an exact model number, not a product family.
  • It is revision-specific. A certificate issued against PD R3.1 does not automatically cover PD 3.2 behaviour.
  • It is time-bound. USB-IF retires acceptance of older revisions on a published schedule, so a design frozen on an old revision eventually cannot be certified at all.

This is why “we are PD 3.2 ready” and “we hold a USB PD 3.2 certification” are two very different statements, and why the USB PD 3.2 certification closure dates below are not trivia.

The USB-IF revision and grace-period model

USB-IF manages the Power Delivery specification through numbered revisions. When a revision is published, it becomes the active baseline, and older revisions are given a wind-down period before new certifications on them stop being accepted.

ElementGrace periodWhat it means
Silicon (controllers, PHY)~18 monthsChip vendors must move to the new revision
End products (chargers, devices)~24 monthsNew product certifications on that revision stop being accepted

The dates below are the practical result of that model as applied by authorised laboratories. USB-IF revises them periodically, so always confirm the current schedule with your own test lab before locking production.

The 2026 closure timeline

RevisionPublishedNew end-product certificationStatus
USB PD R3.1 V1.8Prior baselineClosed September 2026No longer accepted for new products
USB PD R3.2 V1.0October 2023Closing November 2026Window ending; develop on 3.2 now
USB PD R3.2 V1.220 May 2026Active baseline (~24 months)Current latest revision

Source: GRL (Granite River Labs, part of the SGS group since March 2026), a USB-IF authorised test laboratory. The latest published revision is USB PD R3.2 V1.2, dated 20 May 2026.

What “R3.1 V1.8 closed” actually means

This is the part most buyers misunderstand:

  • You can no longer certify a NEW product to PD R3.1. Fresh end-product submissions on that baseline are no longer accepted.
  • Products already certified under PD 3.1 are not recalled. Existing certificates and the products they cover remain valid to sell.
  • But new development should be PD 3.2. Any charger you design from now to ship in 2027+ should be built on the R3.2 baseline, or it will hit a certification dead end.

The risk is not today’s shelf stock — it is a 2027 product plan that freezes on a revision nobody can certify by the time you launch.

USB PD R3.2 V1.2: the current baseline

USB PD R3.2 V1.2 (20 May 2026) is the latest published revision. Its headline change — the one that matters for most chargers — is SPR AVS (Adjustable Voltage Supply) in the 27W–100W band, making AVS mandatory above 27W. Maximum power stays at 240W (EPR); what changes is efficiency and heat in the mid-power range that serves most of the market.

For buyers, a product “designed to USB PD 3.2 including SPR AVS” is the right baseline. Whether a specific SKU also carries a fresh certificate on that revision is a separate, model-by-model question — and the honest answer is that it varies.

The EU angle: common charger and IEC 62680

The European Union reinforces the direction with Directive (EU) 2022/2380 on the common charger, which mandates USB Type-C and references the IEC 62680 series. The relevant standard is IEC 62680-1-2:2024, the IEC edition of USB Power Delivery Specification Revision 3.2, Version 1.0.

For EU-bound chargers, the practical path is a Type-C PD design aligned to the current IEC 62680 edition. PD 3.2 is the specification that edition expresses, so the certification and the regulation are pointing the same way.

What B2B buyers should do now

Here is a short action list for anyone sourcing chargers that need USB PD 3.2 certification in 2026 or 2027.

  1. Specify PD 3.2 as the baseline for new projects. Do not open a 2027 product on an R3.1 frozen design.
  2. Ask for the exact certificate, not a claim. Request the PDF naming your model number and the revision it was tested against.
  3. Confirm the revision, not just the brand. “USB-IF certified” without a revision and model number is not verifiable.
  4. Plan the transition. If you carry PD 3.1-certified stock, sell it through; design replacements on PD 3.2.
  5. Watch the November 2026 window. R3.2 V1.0 closes then; new work should target V1.2 or later.

Red flags when a supplier talks about PD 3.2

  • A certificate that names a different model than the one you are buying.
  • A claim of “PD 3.2 ready” with no model-specific test report.
  • A certificate dated to R3.1 presented as current.
  • Reluctance to send the PDF file (a screenshot is not proof).

None of these means the product is bad. They mean the evidence is missing, and for a compliance-sensitive market that gap is the risk.

Paiyi Power USB PD 3.2 certification and charger manufacturing line
Paiyi Power USB PD 3.2 compliant charger manufacturing line

Paiyi Power: PD 3.2 manufacturing profile

Paiyi Power is an OEM/ODM power supply manufacturer based in China. The figures below are our own factory data, current as of September 2026.

ItemPaiyi Power
Minimum order quantity (MOQ)200 pcs per model
Monthly capacityUp to 150,000 pcs
Production lines4
Employees50
Lead time5–6 weeks
Pre-shipment inspection100% of units
Quality systemISO 9001
PD 3.2 statusProducts designed to the USB PD 3.2 specification, including SPR AVS. Earlier production runs were tested and certified to USB PD 3.1.

One thing we state plainly: Paiyi Power chargers are designed to the USB PD 3.2 specification including SPR AVS, but USB PD 3.2 certification status differs by SKU and by production batch, and earlier runs were certified under USB PD 3.1. Rather than make a blanket claim, we send the current test report for the exact model you are sourcing.


Frequently asked questions about USB PD 3.2 certification

When does USB PD 3.1 certification end?

For new end products, the window closed in September 2026. According to USB-IF authorised laboratories, PD R3.1 V1.8 is no longer accepted for new product certifications. New work should move to USB PD 3.2 certification, and R3.2 V1.0 closes in November 2026.

Is USB PD 3.1 dead?

No — existing certificates remain valid. Products already certified under PD 3.1 can still be sold; what ends is the ability to certify new products on that old revision.

What is the difference between R3.1 V1.8 and R3.2 V1.0 / V1.2?

R3.2 adds SPR AVS below 100W and is the active baseline; V1.2 (20 May 2026) is the latest. R3.1 V1.8 is the last R3.1 revision and is now closed to new certifications.

What grace period does USB-IF give?

About 24 months for end products and 18 months for silicon, counted from each revision’s publication. The exact closure dates are set by authorised labs and revised periodically.

Does the EU common charger directive require PD 3.2?

Not by name, but it points the same way. Directive (EU) 2022/2380 mandates USB Type-C and references IEC 62680-1-2:2024, the IEC edition of USB PD R3.2 V1.0.

Should I only buy PD 3.2 certified chargers now?

For new product development, yes. Source on the PD 3.2 baseline so your 2027 launch is certifiable; continue selling any PD 3.1-certified stock you already hold.

Can I still sell products certified under PD 3.1?

Yes. Existing certificates and the products they cover remain valid; only new certifications on that revision have stopped.

How do I verify a supplier’s PD 3.2 certificate?

Ask for the PDF naming your exact model and the revision tested. Confirm the test house is USB-IF accredited, and check the standard edition. A screenshot is not proof.

Are Paiyi Power chargers certified to PD 3.2?

Paiyi Power products are designed to the USB PD 3.2 specification including SPR AVS; certification status varies by SKU and production batch, and earlier runs were certified under PD 3.1. We send the current certificate and test report for the specific model you are buying rather than making a blanket claim.


Conclusion

The PD 3.1 certification window has closed for new products, and PD 3.2 V1.0 closes in November 2026. The lesson for B2B buyers is not panic about shelf stock — it is to make sure every 2027 product plan is built on the PD 3.2 baseline, with a real, model-specific certificate behind it.

Specifications move. Certificates are what prove you moved with them. Ask for the document, not the adjective.


Sources and further reading

This article was updated in September 2026 using the following primary sources:

Related reading on Paiyi Power


Paiyi Power is a manufacturer of power supplies and chargers supporting USB PD 3.2, with OEM/ODM customisation and 5–6 week delivery.

Talk to our team about your PD 3.2 charger project and certification questions.

Leave a Reply

Your email address will not be published. Required fields are marked *

Related Post

Kiosk Power Supply Guide: Specifying Power for Kiosks, Vending Machines and Self-Service Terminals

Kiosk Power Supply Guide: Specifying Power for Kiosks, Vending Machines and Self-Service TerminalsPublished: September 2026Reading…

Custom Medical Power Supply: A Selection Guide for Medical Device OEMs

Custom Medical Power Supply: A Selection Guide for Medical Device OEMs Published: September 2026 Reading…

Power Supply Solutions for Robotics: How to Specify Power for AMRs, AGVs, Cobots and Service Robots

Power Supply Solutions for Robotics: How to Specify Power for AMRs, AGVs, Cobots and Service…